America II 10/01/2009
XILINX/ALTERA
Ceramic Caps
MRE 12 - 18+ weeks
TDK 10 - 16 weeks
AVX 10 - 16 weeks
KEM 10 -14 weeks
Tantalum Caps
AVX 8 - 12 weeks
VISH 8 - 12 weeks
Kem 9 - 12 weeks
Aluminum Caps
PAN ECOS (snap in) 26 Weeks
NIH LLQ,LLS,LGU,high Voltage 6-18 weeks
Relays 18 weeks
Switches 14 weeks
Crystals 8 - 10 weeks
Fans 12 weeks
Resistors
Bourns 6 - 8 weeks
NIC Comp Stock - 10 weeks
SEI Stock - 9 - 10 weeks
Vishay/Dale 7 - 8 weeks
Filters Prices Increasing –
Lead Times Stable, Stock to 16-18 Weeks
Fuses 2 - 10 weeks
Inductors Pricing Increasing – Lead
Times Stable
SEI 6 - 8 weeks
Bourns 9 - 11 weeks
Panasonic 8 - 10 weeks
NIC Comp 8 - 10 weeks
The FPGA market is changing daily. More
specifically the lead-times with Xilinx and
Altera are growing daily. For example, the
XC5V SERIES, at 15 wks. and the XC9500XL
SERIES IN XILINX is 7-9 wks. and of course
America II has you covered! As far as Altera,
their lead-times are stretching and seem to
be affecting most of the product families.
For example, the EP3C series... is at 10wks,
also there are PROMS that are affected as
well. The EPCS16SI8N... are 12-14wks with
very little stock available at franchise.
America II has taken steps to ensure that
we will always be able to support our
customer with quality product from secure
sources and current date codes.
CYPRESS
HOT PARTS:
CY37128P160-100AXC 14 wks and AM II has stock
CY7C68013A-100AXC 11 wks and AM II has stock
CY7C68013A-128AXC 11 wks and AM II has stock
CY7C68013A-56PVXC 10 wks and AM II has stock
FREESCALE
MC68HC711 series at 4-6 weeks
MC705 series at 13 weeks
MC9S12D series at 20 weeks
The ITC affected product is still banned from Import until the ITC
ruling expires in Sept. 2010.
NFINEON
8-bit 8 -16 weeks
16-bit 6 - 22 weeks
LATTICE
FPGA 8 - 10 weeks
CPLD 8 - 12 weeks
SPLD 8 - 10 weeks
St MICRO
This series at 10- 12 weeks
LM324DT, LM339DT, LM2902DT, TL084CDT, LM358DT, LM393DT,
LM2903DT, LM2904DT, TJM4558CDT, NE555DT, ST7538xx, ST7540,
L598xx, L691xx, L692xx
This series at 20 weeks
KD1084, LD1085, L49, ST2L05R, L78M, LFxxCPT, LD29150PT, STSR,
L4931, LD1117, L78L, L79L, LD13TRMC, ST6, ST7
This series at 24 weeks
LD1117AS, LD1117S, LD29, L4931, LM2931, L494, LD1086V,
LD1117V
All others at 6-8 weeks
MARVEL
Lead times are 6-8 weeks right now.
The PXA 255 series will be going EOL as of Dec. 2009.
MICROCHIP
Microchip has seen an up-tick in business, so they are back to
a full
PASSIVES
Panasonic 8 - 10 weeks
NIC Comp 8 - 10 weeks
Murata 8 - 10 weeks
Vishay 8 - 10 weeks
OPA
current lead time for the following devices
is 20 weeks
OPA134UA OPA627AU
OPA2134PA OPA340NA/2K5 - 14 weeks
TEXAS INSTRUMENTS
Lead times are stretching to 20+ weeks. TMS,
MSP and TPS series products and others
appear to be following suit.
MAXIM
There are currently no major lead time issues
with Maxim. The current standard lead time
ranges from stock to possibly 6 weeks.
ATMEL
ATMEGA’S
Standard lead times are ranging 4 to 8
weeks. Some lead times could be longer
depending on the device. America II
currently stocks lead free devices.
Current lead time for “AU” suffix is currently
stock up to 8 weeks.
DISCRETES
EPROM/EEPROM
EPROMS
ST Micro / Numonyx continue to run the
show in the EPROM/EEPROM market
Atmel
now 100% to lead-free on all OTP EPROM
Check out the EPROM’s & EEPROM’s that we have in stock.
M27C1001-10F1 M27C256B-10F1
M27C4001-12C6 M27C4002-10F1
M27C512-10C6 M27C512-10F1
M27C512-12F1 M27C801-100F1
All Bipolar Transistor
lead times 6 – 8 weeks
IGBT’s (TO-247)
lead time 12-14 weeks
ST Micro
SOT223 lead time 20 weeks
Infineon
lead time 8 -16 weeks
On Semi
TO 220 lead time 35 weeks
Diode TVS Transient Voltage Suppressors
out to 15 weeks and
moving
On Semi
lead time on SC-74 12 weeks
Thyristors Triacs BTB
lead time up to 28 weeks
ST Micro
SCRs DPAK 14 -16 weeks and D2PAKs are running
11-13 weeks
Rectifiers
lead time 6 – 8 weeks
On Semi SOD123
are at 12 weeks
Zener Diodes
Standard lead time 6 - 8 weeks
On Semi (SOD)
12 weeks
Vishay (SOT 23)
families CNY & SFH lead time 14 – 16 weeks
Mosfet’s
8 -14 weeks lead time
TVS
standard lead time 8 – 10 weeks
Avago (Optocouplers)
standard lead time 6 – 8 weeks
Osram family (LYE & LYT)
14-16 weeks lead time and
increasing
SOD123 & SC-59
12 weeks
Light Emitting Diodes
lead times stable @ 4-8 weeks.
LED
Stable Osram stabilizing after EOL of OLED products,
lead times 4 - 8 weeks
Motion Control
lead time 4 - 8 weeks
Optocoupler
4 - 8 weeks stable to improving
Fairchild
families FOD, MOC & HCPL lead time 14-16 weeks
(increasing)
Vishay
4 - 6 weeks (improving)
Toshiba
(Optocouplers) 8 weeks lead time
Small Signal Device
lead time 4 – 6 weeks