America II 10/01/2009

XILINX/ALTERA

Ceramic Caps

MRE 12 - 18+ weeks

TDK 10 - 16 weeks

AVX 10 - 16 weeks

KEM 10 -14 weeks

Tantalum Caps

AVX 8 - 12 weeks

VISH 8 - 12 weeks

Kem 9 - 12 weeks

Aluminum Caps

PAN ECOS (snap in) 26 Weeks

NIH LLQ,LLS,LGU,high Voltage 6-18 weeks

Relays 18 weeks

Switches 14 weeks

Crystals 8 - 10 weeks

Fans 12 weeks

Resistors

Bourns 6 - 8 weeks

NIC Comp Stock - 10 weeks

SEI Stock - 9 - 10 weeks

Vishay/Dale 7 - 8 weeks

Filters Prices Increasing –

Lead Times Stable, Stock to 16-18 Weeks

Fuses 2 - 10 weeks

Inductors Pricing Increasing – Lead

Times Stable

SEI 6 - 8 weeks

Bourns 9 - 11 weeks

Panasonic 8 - 10 weeks

NIC Comp 8 - 10 weeks

The FPGA market is changing daily. More

specifically the lead-times with Xilinx and

Altera are growing daily. For example, the

XC5V SERIES, at 15 wks. and the XC9500XL

SERIES IN XILINX is 7-9 wks. and of course

America II has you covered! As far as Altera,

their lead-times are stretching and seem to

be affecting most of the product families.

For example, the EP3C series... is at 10wks,

also there are PROMS that are affected as

well. The EPCS16SI8N... are 12-14wks with

very little stock available at franchise.

America II has taken steps to ensure that

we will always be able to support our

customer with quality product from secure

sources and current date codes.

CYPRESS

HOT PARTS:

CY37128P160-100AXC 14 wks and AM II has stock

CY7C68013A-100AXC 11 wks and AM II has stock

CY7C68013A-128AXC 11 wks and AM II has stock

CY7C68013A-56PVXC 10 wks and AM II has stock

FREESCALE

MC68HC711 series at 4-6 weeks

MC705 series at 13 weeks

MC9S12D series at 20 weeks

The ITC affected product is still banned from Import until the ITC

ruling expires in Sept. 2010.

NFINEON

8-bit 8 -16 weeks

16-bit 6 - 22 weeks

LATTICE

FPGA 8 - 10 weeks

CPLD 8 - 12 weeks

SPLD 8 - 10 weeks

St MICRO

This series at 10- 12 weeks

LM324DT, LM339DT, LM2902DT, TL084CDT, LM358DT, LM393DT,

LM2903DT, LM2904DT, TJM4558CDT, NE555DT, ST7538xx, ST7540,

L598xx, L691xx, L692xx

This series at 20 weeks

KD1084, LD1085, L49, ST2L05R, L78M, LFxxCPT, LD29150PT, STSR,

L4931, LD1117, L78L, L79L, LD13TRMC, ST6, ST7

This series at 24 weeks

LD1117AS, LD1117S, LD29, L4931, LM2931, L494, LD1086V,

LD1117V

All others at 6-8 weeks

MARVEL

Lead times are 6-8 weeks right now.

The PXA 255 series will be going EOL as of Dec. 2009.

MICROCHIP

Microchip has seen an up-tick in business, so they are back to

a full

PASSIVES

Panasonic 8 - 10 weeks

NIC Comp 8 - 10 weeks

Murata 8 - 10 weeks

Vishay 8 - 10 weeks

OPA

current lead time for the following devices

is 20 weeks

OPA134UA OPA627AU

OPA2134PA OPA340NA/2K5 - 14 weeks

TEXAS INSTRUMENTS

Lead times are stretching to 20+ weeks. TMS,

MSP and TPS series products and others

appear to be following suit.

MAXIM

There are currently no major lead time issues

with Maxim. The current standard lead time

ranges from stock to possibly 6 weeks.

ATMEL

ATMEGA’S

Standard lead times are ranging 4 to 8

weeks. Some lead times could be longer

depending on the device. America II

currently stocks lead free devices.

Current lead time for “AU” suffix is currently

stock up to 8 weeks.

DISCRETES

EPROM/EEPROM

EPROMS ST Micro / Numonyx continue to run the

show in the EPROM/EEPROM market

Atmel now 100% to lead-free on all OTP EPROM

Check out the EPROM’s & EEPROM’s that we have in stock.

M27C1001-10F1 M27C256B-10F1

M27C4001-12C6 M27C4002-10F1

M27C512-10C6 M27C512-10F1

M27C512-12F1 M27C801-100F1

All Bipolar Transistor lead times 6 – 8 weeks

IGBT’s (TO-247) lead time 12-14 weeks

ST Micro SOT223 lead time 20 weeks

Infineon lead time 8 -16 weeks

On Semi TO 220 lead time 35 weeks

Diode TVS Transient Voltage Suppressors out to 15 weeks and

moving

On Semi lead time on SC-74 12 weeks

Thyristors Triacs BTB lead time up to 28 weeks

ST Micro SCRs DPAK 14 -16 weeks and D2PAKs are running

11-13 weeks

Rectifiers lead time 6 – 8 weeks

On Semi SOD123 are at 12 weeks

Zener Diodes Standard lead time 6 - 8 weeks

On Semi (SOD) 12 weeks

Vishay (SOT 23) families CNY & SFH lead time 14 – 16 weeks

Mosfet’s 8 -14 weeks lead time

TVS standard lead time 8 – 10 weeks

Avago (Optocouplers) standard lead time 6 – 8 weeks

Osram family (LYE & LYT) 14-16 weeks lead time and

increasing

SOD123 & SC-59 12 weeks

Light Emitting Diodes lead times stable @ 4-8 weeks.

LED Stable Osram stabilizing after EOL of OLED products,

lead times 4 - 8 weeks

Motion Control lead time 4 - 8 weeks

Optocoupler 4 - 8 weeks stable to improving

Fairchild families FOD, MOC & HCPL lead time 14-16 weeks

(increasing)

Vishay 4 - 6 weeks (improving)

Toshiba (Optocouplers) 8 weeks lead time

Small Signal Device lead time 4 – 6 weeks

 

 

 
 